SAxxxStorageArrayConfigurationGuideOrder Number: EK–SAXXX–CG. D01This manual describes the SAxxx family of storage arrays: the SA550,SA600, SA650, SA80
Documentation ConventionsThe following conventions are used in this manual:TA8x7 Refers to the TA857 and TA867 tape drives collectively.RA7x Refers to
5.5.3 Installing the Disk DriveUse the following procedure to install the disk drive in the storage array:1. Lift the disk drive into position at the
Figure 5–11 Installing an RA9x Disk DriveGUIDE RAILPLATE ASSEMBLYCOM-0148LONG PAN-HEAD SCREWSRA90/RA92DRIVE CHASSISCABINET FRONTDRIVE REARGUIDE RAIL
5.5.4 Installing SDI Cables and Power CordsThe storage arrays are shipped with internal SDI cables and power cords forstorage devices. You need only t
Figure 5–12 SA600/SA800 SDI Cabling67012345SDICABLESAAAAAAAABBBBBBBB71356024I/OBULKHEADCXO-2132BAAAAAAAABBBBBBBBCABLETROUGHCABLETROUGHStorage Array Ad
Figure 5–13 SA650/SA850 CablingRA9xCABLE TROUGHA B A BABBAABBAABBAABLFRFRRLRLFRFRRLRLFRFRRLRRFRRLFLRPOSITION 0RA9xPOSITION 2RA9xPOSITION 4RA9xPOSITION
Figure 5–14 SA600/SA800 Power CordsJ4J7J5J8J6J9J1J2J3POWERCONTROLLERCXO-2133BAC POWERCORDDISKDRIVEPOWERCORDSDISKDRIVEPOWERCORDSStorage Array Add-Ons a
Figure 5–15 SA650/SA850 Power CordsJ4J7J5J8J6J9J1J2J3POWERCONTROLLERCXO-2930AAC POWERCORDENCLOSUREPOWERCORDENCLOSUREPOWERCORDDISKDRIVEPOWERCORDSDISKDR
5.6 Guide Rail Plate Assembly Installation5.6.1 Preparing the SA900 CabinetEach enclosure is mounted in the cabinet with one guide rail plate assembly
Figure 5–16 Guide Rail Assembly Installation for SA900 Storage ArrayMOUNTING BRACKETFLAT HEADSCREWSNUT BARLOCKWASHERSHOULDERSCREWSGUIDE RAILPLATE ASSE
b. Remove the bezel filler.WARNINGUse care in supporting the guide rail plate. It is heavy and awkward toposition within the cabinet. If possible, use
Related DocumentsTable 2 lists documentation available to supplement this guide.Table 2 SAxxx Storage Array Related DocumentationDocument TitleDocumen
Figure 5–17 SA900 Mounting Rail Holes5.6.4 Right Position Guide Rail Plate InstallationInstall the guide rail plate in the right position within the c
3. Open the front cabinet door and remove the rear panel.4. From the cabinet door, remove the bezel filler that corresponds to add-onsequence position
g. From the front, insert and tighten a flathead screw through the top holein the guide rail plate to the U-nut mounted on the cabinet front verticalup
5.7.1 Preparing for InstallationThe RA9x add-on kit includes the following items:• RA9x disk drive• Hardware mounting kit• Guide rail plate assembly•
Figure 5–19 Installing the Add-On Disk DriveGUIDE RAILPLATE ASSEMBLYCOM-0137SEMS SCREWSRA90/RA92DRIVE CHASSISCABINET FRONTDRIVE REARGUIDE RAIL5–32 S
4. Remove the lifting device.5. Using the long pan-head screws (10-32 x 3/4-inch) that came with the diskdrive, connect the chassis retaining brackets
Figure 5–20 SA900 RA9x SDI CablingRoute the power cords from the storage devices on the right side of thecabinet down the right vertical I/O bulkhead.
6. Slide the external SDI cable through the either the left or right cable slot inthe bottom filler panel.For easy access to the cable slot, you can re
Figure 5–21 SA900 RA9x Power CordsJ4 J5J6 J1J3J7J8 J9J2(PHASE 1)(PHASE 2)(PHASE 3)J0n1n2n3CXO-3569A-MC5–36 Storage Array Add-Ons and Upgrades
Figure 5–22 H9A00 Rear Panel Assembly PartsStorage Array Add-Ons and Upgrades 5–37
Figure 5–23 H9A00 Rear PanelCOM-0116REARPANELHEXWRENCHHEXFASTENERHOLES FORPINSRECEPTACLEFOR HEXFASTENERPINS5–38 Storage Array Add-Ons and
5.8 Adding an ESE50 SSDWhen installing an ESE50 solid-state disk (SSD) in the SA900 storage arraycabinet, the CK–SA900–L2 installation kit is required
Figure 5–24 ESE50 OCPESE50TESTBAFAULTRUNREADY PROTECTWRITEFour−Character Alphanumeric DisplayUnit NumberStatusLEDIndicatorRUNSwitchFAULTSwitchWRITESwi
Figure 5–25 ESE50 Rear PanelPORTPORTABFOR CONTINUED PROTECTION AGAINST RISK OF FIRE,REPLACE ONLY WITH SAME TYPE AND RATING OF FUSES.DISCONNECT POWER B
7. Route the power cords from the SSDs and enclosures on the left side of thecabinet down the left vertical I/O bulkhead.8. Connect the opposite end o
Figure 5–26 SA7x Enclosure PackingCONTAINERDESICCANTSHIPPINGSTRAPSCXO-2439B_SMANUALS ANDMOUNTINGHARDWARESA7xENCLOSUREThe first add-on SA7x enclosure al
Use the following procedure to prepare for SA7x enclosure installation:1. To protect the OCP during installation, remove it from the enclosure frontpa
9. Remove the chassis stabilizer bracket from the cabinet by removing the twoserrated hex-head bolts. Set these parts aside. (Refer to Figures 5–8 and
Figure 5–28 SA7x Enclosure Guide Rail InsertsCOM-0149SHIPPED POSITION RIGHT HANDINSTALLATIONLEFT HAND INSTALLATIONSA7x ENCLOSURESTEEL INSERTS5–46 Stor
Figure 5–29 SA7x Front Clamping AssemblySA7xENCLOSURECHASSISFLATHEADSCREWCONICALWASHER/SCREWFLATWASHERCHASSISRETAINERTOPCHASSISRETAININGBRACKETRAILCHA
1Introducing the Storage ArraysThis chapter describes the characteristics and maximum configurations of anSAxxx storage array, and how to determine the
5.10.2 Installing the EnclosureUse the following procedure to install an enclosure in the storage array:1. Lift the enclosure into position at the fro
Figure 5–30 SA7x Enclosure InstallationENCLOSUREREARGUIDE RAILGUIDE RAILPLATE ASSEMBLYSA7xENCLOSURECABINETFRONTCXO-2441BStorage Array Add-Ons and Upgr
Figure 5–31 SA550, SA650, and SA850 Rear Clamping AssemblySA7xENCLOSURECHASSISREARRETAINERCHASSISBRACKETWEDGEBLOCKSCREWHELICALWASHERFLATWASHERHOLE 2 O
5.10.3 Installing SDI Cables and Power CordsThe SA550, SA650, and SA850 storage arrays are shipped with internal cablesand power cords installed for a
Figure 5–33 SA550 Internal SDI CablingABBBAARFRFRFRFLFLF LFRRRRRRRRLFLRLRLRLRLEVEL 0RA82LEVEL 1LEVEL 2RA82CXO-2445BRA82 I/O PANELSA7x I/O PANELRA82SA7
Figure 5–34 SA650/SA850 Internal SDI CablingRA9xCABLE TROUGHA B A BABBAABBAABBAABLFRFRRLRLFRFRRLRLFRFRRLRRFRRLFLRPOSITION 0RA9xPOSITION 2RA9xPOSITION
Figure 5–35 SA550 Power Cord ConnectionsSA701SA702RA822COM-0134RA821RA820J4 J5 J6 J1J3J7 J8 J9 J2ENCLOSUREPOWER CORDSDISK DRIVE
Figure 5–36 SA650/SA850 Power Cord ConnectionsJ4J7J5J8J6J9J1J2J3POWERCONTROLLERCXO-2930AAC POWERCORDENCLOSUREPOWERCORDENCLOSUREPOWERCORDDISKDRIVEPOWER
5.10.4 Completing the InstallationWhen you have finished connecting SDI cables and power cords, complete theinstallation as follows:1. Restore power to
Figure 5–37 SA900 Chassis Retaining BracketsSHORT SEMSPAN-HEADSCREWSCHASSIS RETAINING BRACKETCXO-3939A-MCTB1ATTACHRIGHTOCPATTACHLEFTOCP5.11.2 Install
Table 1–2 Storage Array ConfigurationsStorage DevicesArray RA82 RA9x SA7x ESE50 TA857TA867-AA/ABAuthorizedConfigurationSA550 23None 12None None None Tab
2. Lift the SA7x enclosure to the installation position (see Figure 5–38).a. Lift the enclosure to the front of the cabinet with the aid of a Digital-
Figure 5–38 Installing the SA7x Enclosure in the SA900GUIDE RAILPLATE ASSEMBLYCXO-3574A-MCSCREWSSA7xENCLOSURECABINET FRONTENCLOSURE REARGUIDE RAILStor
5.11.3 Installing SDI Cables and Power CordsThe SA900 storage array is shipped with internal cables and power cordsfor storage devices installed at th
Figure 5–39 SA900 SDI Cable Connections5. Route the power cords from the storage devices on the right side of thecabinet down the right vertical I/O b
Figure 5–40 SA900 Power Cords—SA7x Enclosures5–62 Storage Array Add-Ons and Upgrades
8. Coil any excess power cord in front of the power controller.9. Connect the external SDI cables in the SA900 storage array. Be sure totighten the ca
• You must install and route the internal SCSI/SDI cables and the power cords.WARNINGTo maintain cabinet stability, always add the components in the o
5.12.1 Preparing for InstallationUse the following procedure to prepare for installing TA8x7 storage subsystems:1. Remove the rear cabinet panel and f
9. Push the adapter into the cabinet so that the adapter bracket aligns with themounting holes and secure with the two pan-head screws (10-32 x 3/4-in
Use the following procedure to connect the TA8x7 cables:1. Make sure the circuit breaker for the TZ8x7 tape subsystem is in the offposition.2. Make su
Figure 1–1 Fully Populated Storage ArraySA550SA600SA7xRA82SA7xRA82RA82RA90RA90RA90 RA90RA90 RA90RA90 RA90SA650RA7xRA7xRA90 RA90RA90 RA90RA90 RA90SA800
6. Connect the SCSI terminator into the upper connector on the TZ8x7 tapesubsystem.7. Connect the the 7.6 meter (25 foot) SDI/STI external interface c
Figure 5–44 SA650/SA850 Authorized Configurations (Front Views)RA9xRA9xSA650-HA/HDSA850-HA/HDRA9xRA9xSA650-JA/JDSA850-JA/JDRA9xRA9xSA7xSA7xRA9xRA9xRA9x
Use a hex wrench to turn the two quarter-turn fasteners at the top of thepanel counter-clockwise.4. Grasp the panel by the edges, tilt it toward you a
Figure 5–45 Power ControllerICBOJ10J11J12J13COM-0117GROMMETEDCORDOPENINGPOWER CONTROLBUS CONNECTORSBUS/OFF/ONSWITCHCIRCUITBREAKERSERI
3. Connect internal SDI cables for all RA9x drives as shown on the configurationlabel shown in Figure 5–47.Figure 5–46 SA650/SA850 I/O BulkheadCAPTIVES
Figure 5–47 SA650/SA850 SDI CablingRA9xCABLE TROUGHA B A BABBAABBAABBAABLFRFRRLRLFRFRRLRLFRFRRLRRFRRLFLRPOSITION 0RA9xPOSITION 2RA9xPOSITION 4RA9xPOSI
1. Position the guide rail plate on the left or right side of the cabinet frame,depending on which side the enclosure will be installed.2. Use three s
Figure 5–48 Assembling the Guide Rail Mounting AssemblyCOM-0136GUIDE RAILPLATE ASSEMB LYNUT BARNUT BARNUT BARLOCK WASHERSHOULDER SCREWCABINETREARVE
Figure 5–49 SA650/SA850 Power Cord ConnectionsJ4J7J5J8J6J9J1J2J3POWERCONTROLLERCXO-2930AAC POWERCORDENCLOSUREPOWERCORDENCLOSUREPOWERCORDDISKDRIVEPOWER
5.13.6 Completing the UpgradeThe following procedure is the final phase of the upgrade procedure:1. Replace the I/O bulkhead by pivoting it upward unti
Table 1–3 Storage Device CapacitiesStorage Device TypeFormatted StorageCapacityRA82 Fixed disk drive 0.623 GBRA90 Fixed disk drive 1.22 GBRA92 Fixed d
AEnvironmental StabilizationAlways ensure environmental stabilization of the disk drive or prior toinstallation or before operation if the disk drive
BStorage Array Part NumbersTable B–1 lists cable part numbers. Table B–2 lists the assembly part numbers for the storagearrays.Table B–1 Cable Part Nu
Table B–2 SAxxx Assembly Part NumbersPower Controllers Part Number881A power controller881B power controller887B power controller30–24374–0130–24374–0
CRA7x and SA7x ConfigurationsTables C–1 and C–2 show authorized RA7x disk drive and SA7x enclosureconfigurations.The description column of the RA7x confi
Table C–2 SA7x ConfigurationsEnclosure DescriptionRA70DiskDriveRA71DiskDriveRA72DiskDriveRA73DiskDriveMinimumStorageCapacitySA70–HK Field add-onSA550/S
Table C–2 (Cont.) SA7x ConfigurationsEnclosure DescriptionRA70DiskDriveRA71DiskDriveRA72DiskDriveRA73DiskDriveMinimumStorageCapacitySA72–FK Field add-o
IndexCCharacteristics of SAxxx, 1–1Component descriptionH9646 cabinet, 2–1H9A00 cabinet, 2–1power controller, 2–3RA7x disk drive, 2–1RA82 disk drive,
2Storage Array DescriptionsThis chapter contains technical descriptions of the SA550, SA600, SA650, SA800,SA850, and SA900 storage arrays, the storage
OOperator control panel (OCP)affixing the label, 3–27PPacking storage devices, 5–6Part numbers, SAxxx, B–1Power controllerdescription, 2–3powering up,
2.6 RA9x Disk DriveThe RA90 and RA92 disk drives are physically identical, but have differentcapacities, as follows.• The RA90 has a capacity of 1.22
2.8.2 TZ867-Series Magazine Tape SubsystemThe TZ867 magazine tape subsystem is an electromechanical device that usesfrom one to seven CompacTape III c
December 1993While Digital believes the information included in this publication is correct as of the date ofpublication, it is subject to change with
Table 2–1 Environmental SpecificationsCondition SpecificationOptimum Operating EnvironmentTemperatureRate of ChangeStep Change+18° to +24° C (+65° to +7
2.11.1 SA550 Storage Array ConfigurationsTable 2–2 lists the three authorized SA550 storage array configurationsHA/HD, JA/JD, and UA/UD that comply with
Figure 2–1 SA550–JA/SA550–JD Storage ArrayLEVEL 0RA82DISKDRIVELEVEL 1RA82DISKDRIVELEVEL 2RA82DISKDRIVECXO-2413BLEFTSA7xENCLOSURERIGHTSA7xENCLOSURE2–6
Table 2–4 SA550 Storage Array Physical SpecificationsModel Height Width DepthInstalledWeightShippingWeightSA550–HASA550–HD156.2 cm(61.5 in)55.9 cm(22.0
Table 2–7 SA550 Electrical Specifications—240/416 Vac 50 HzInput Current (Amps) Power DissipationModel Start-up PH1 PH2 PH3 Neutral Watts Kilojoules/Hr
Figure 2–2 SA600- and SA800-Series Storage ArraysSAXXXLEVEL 3RA9xDISK DRIVESCXO-3575A-MCLEVEL 0RA9xDISK DRIVESLEVEL 1RA9xDISK DRIVESLEVEL 2RA9xDISK DR
Table 2–9 SA600 and SA800 ConfigurationsModelRA90 DiskDrivesRA92 DiskDrivesPowerController VoltageStorageCapacitySA600–CASA600–CD1 0 881A881B120 Vac240
Table 2–11 SA600 and SA800 General Electrical SpecificationsSpecification 110-120 Vac 60 Hz 220-240 Vac 50 HzInrush Current per Drive 12.8 amperes peak
RA9x disk drives are installed in an H9646 cabinet and receive their powerthrough a power controller. Figure 2–3 shows a typical SA600-series storagea
Figure 2–3 SA650/SA850 Storage ArrayCXO-2459DSA7xENCLOSURELEVEL 3 SA7xENCLOSURE(ADD-ON)LEVEL 0RA90/RA92DISK DRIVESLEVEL 1RA90/RA92DISK DRIVESLEVEL 2RA
ContentsPreface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix1 Introducin
Table 2–15 SA650 and SA850 Physical SpecificationsModel Height Width DepthInstalledWeightShippingWeightSA650–FASA650–FDSA850–FASA850–FD156.2 cm(61.5 in
Table 2–18 SA650 and SA850 Electrical Specifications—240/416 Vac 50/60 HzInput Current (Amps) Power DissipationModel Start-Up PH1 PH2 PH3 Neutral Watts
Figure 2–4 SA900 Storage ArrayCOM-0109digital2–16 Storage Array Descriptions
Table 2–19 SA900 Factory ConfigurationsModelStorageDevices QtyPowerController VoltageStorageCapacityH9A00–BAH9A00–BBNone 0 881A881B120 Vac240 Vac0.0 GB
Figure 2–5 SA900 Factory ConfigurationsH9A00-BAH9A00-BBSA900-AASA900-ADSA900-AESA900-AFSA900-BASA900-BDSA7xRA92SA900-CASA900-CDRA92RA92SA900-EDRA92RA92
2.14.2 SA900 SpecificationsTables 2–20 through 2–23 list the physical and electrical specifications for theSA900 storage array. Refer to Table 2–1 for a
Table 2–20 (Cont.) SA900 Physical SpecificationsModel Height Width DepthInstalledWeightShippingWeightSA900–SESA900–SF170 cm(66.9 in)61.0 cm(24.0 in)108
Table 2–23 SA900 Electrical Specifications—240/416 Vac 50 HzInput Current (Amps) Power DissipationModel Start-Up PH1 PH2 PH3 Neutral Watts Kilojoules/H
3Installing a Storage ArrayThis chapter explains how to install a storage array. All the configurationsdiscussed in this chapter, except the SA550–UA/S
3 Installing a Storage Array3.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–43
Always observe the following precautions:WARNINGHazardous voltages are present inside the storage cabinet and enclosures.You must be a qualified Digita
Figure 3–1 Using the ESD Grounding StrapOPERATOR’S ESDGROUNDING STRAPESD GROUNDING STRAPGROUNDED TO SA7xENCLOSURE CHASSISCXO-2609B_SESD GROUNDINGSTRAP
3.1 ToolsYou need the following tools to install the storage arrays:• #1 Phillips screwdriver• #2 Phillips screwdriver• 1/8-inch hex wrench• 5/32-inch
Figure 3–2 H9646 Shipping ContainerCOVERFOAM CAPMOISTUREBARRIERSHIPPINGSTRAPSCARDBOARDU-SECTIONMACHINE BOLTS(2 EACH SIDE)PALLETLEVELERSHIPPINGBOLTSHIP
Figure 3–3 H9A00 Shipping Container3–6 Installing a Storage Array
2. Remove the outer shipping carton.CAUTIONDo not remove the desiccant bag or open the sealed moisture barrier untilthe storage array is environmental
Figure 3–4 H9646 Unloading RampsCXO-688C_SSHIPPINGPALLETRIGHT RAMPATTACHES HERESTEELDOWELRIGHTUNLOADINGRAMPEXTEND RAMP TOFULL LENGTHLEFTUNLOADINGRAMP2
Figure 3–5 Adjusting the Cabinet Leveler FeetLOCKNUTLEVELERHEX NUTLEVELERFOOTCXO-395C_S7. Move the cabinet to its final position.3.3.3 Leveling the Cab
Figure 3–6 Unloading the CabinetCXO-924A_S• Keys to the cabinet front panel are taped to the outside of the panel.Installing an H9A00 cabinet requires
Figure 3–7 H9A00 Rear Panel AssemblyCOM-0112REARPANELSLIDING SIDE PANELBOTTOMSPREADEREND PANEL10-32 × 1/2-INCH SCREWS10-32 × 1/2-INCHSCREWS10-32 ×
5.7.2 Installing the Disk Drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–315.7.3 Installing SDI Cables and Power Cords
2. Remove the red shipping brackets from the storage devices.See the SA482 Storage Array User Guide for procedures for removing RA82shipping brackets
Figure 3–8 H9A00 Cabinet Parts (Rear View)Installing a Storage Array 3–13
3.4.2 Installing the Filler PanelsLocate the top and bottom spreaders shown in Figure 3–8. These bracingstructures are connected to the top and bottom
3.4.4 Installing the Rear PanelUse the following procedure to install the rear panel:1. Lift the rear panel into place by fitting the two pins on the b
Figure 3–9 H9A00 Rear Panel InstallationCOM-0116REARPANELHEXWRENCHHEXFASTENERHOLES FORPINSRECEPTACLEFOR HEXFASTENERPINS3–16 Installing a
Figure 3–10 SA550 External SDI Cable ConnectionsABBBAARFRFRFRFLFLF LFRRRRRRRRLFLRLRLRLRLEVEL 0RA82LEVEL 1LEVEL 2RA82CXO-2445BRA82 I/O PANELSA7x I/O PA
Figure 3–11 SA600/SA800 External SDI Cable Connections67012345SDICABLESAAAAAAAABBBBBBBB71356024I/OBULKHEADCXO-2132BAAAAAAAABBBBBBBBCABLETROUGHCABLETRO
Figure 3–12 SA650/SA850 External SDI Cable ConnectionsRA9xCABLE TROUGHA B A BABBAABBAABBAABLFRFRRLRLFRFRRLRLFRFRRLRRFRRLFLRPOSITION 0RA9xPOSITION 2RA9
3.5.2 H9A00 SDI Cable ConnectionsThe H9A00 cabinet includes a left and a right vertical I/O bulkhead. To accessthese bulkheads, you must first remove t
Figure 3–13 SA900-RD External SDI Cable ConnectionsInstalling a Storage Array 3–21
3–3 H9A00 Shipping Container . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–63–4 H9646 Unloading Ramps . . . . . . . . . . . . .
Figure 3–14 SA900-SD External SDI Cable Connections3.6 RA7x Disk Drive Serial NumbersThe RA7x disk drive serial number appears on two labels: one on t
The serial number contains the following information:• Manufacturing location code (two characters)• Date code (three digits)• Component serial number
3.7 Selecting the Line Input VoltageEach storage device has a Line Voltage Selector switch that is to be set to thelocal line input voltage, either 12
Figure 3–16 Power and Line Voltage Selector SwitchesBBBBBBAAAAAAUNIT 1UNIT 2VOLTAGESELECTORSWITCHCXO-2464CB BA ANOTE: HEAVY LINES INDICATE INTERNAL S
Figure 3–17 SA7x Drive Power SwitchesFRONTCOVERLEFTFRONTLEFTREARRIGHTREARRIGHTFRONTCXO-1867D_SRIGHTREARRIGHTFRONTLEFTREARLEFTFRONTUnit SelectRunRunFau
3.8 Installing the OCP LabelThe standard OCP labels are in English. A package of self-adhesive labelsin other languages is also supplied. To change th
NoteSome European markets use the 887B power controller which iselectrically the same as the 881B although its physical configurationis slightly differ
3. Place the power controller circuit breaker (CB1) shown in Figure 3–20 in theoff (down) position.4. The Bus/Off/On switch is a three-position switch
Figure 3–20 Storage Array Power ControlsJ10J11J12J13ICBORA90 DRIVECIRCUIT BREAKERCXO-3576A-MCRA90 DISK DRIVEPOWER CABLERECEPTACLESA7x ENCLOSUREMASTER
4Removing and Replacing Cabinet ComponentsThis chapter explains how to remove and replace storage array cabinetcomponents which include the following:
5–20 SA900 RA9x SDI Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5–345–21 SA900 RA9x Power Cords . . . . . . . . . .
CAUTIONDo not attempt to install a storage array unless you have receivedtraining in electrostatic discharge (ESD) procedures and have takenproper pre
Figure 4–1 H9646 Front PanelHEXWRENCHQUARTER-TURNFASTENERCXO-2462BSUPPORTBRACKETFRONTPANELTABS4.1.3 Replacing the I/O BulkheadThe H9646 I/O bulkhead c
Figure 4–2 H9646 Rear PanelCABINETREARBUSTLECABINETREARACCESSPANELHEXWRENCHCXO-2131CI/O BULKHEADPINSHEXFASTENER1. Remove the cabinet rear panel. (See
2. Place the bottom slots of the bulkhead over the pins in the frame and rotatethe bulkhead upward.3. Fasten the captive screw in the center of the bu
4.1.4 Replacing the Power ControllerUse the following procedure to remove the power controller located in the bottomof the H9646 cabinet behind the I/
Figure 4–4 I/O Bulkhead SupportCOM-0118CABINETREARACCESSPANELPINSBULKHEAD FRAMEWING NUTBULKHEADSUPPORTCABINETREARBUSTLE6. Place the bottom slots
Figure 4–5 Power Controller Power Cord ConnectionsCOM-0119POWERCONTROLLERRECEPTACLEDISK DRIVEPOWER CORDSCABLE MOUNT /TIE WRAP10. Set the power
Figure 4–6 H9646 Cabinet Power ControllerCXO-3577A-MCREARVERTICALUPRIGHTSU-NUTSNO. 10–32 PHILLIPSHEAD SCREWSTRAINRELIEFPOWER CONTROLLERU-NUTHOLE NO. 2
1. Unlock the two quarter-turn fasteners at the top of the panel. Use a hexwrench to turn the fasteners counterclockwise.2. Grasp the panel by its edg
Figure 4–7 H9A00 Rear Panel InstallationCOM-0116REARPANELHEXWRENCHHEXFASTENERHOLES FORPINSRECEPTACLEFOR HEXFASTENERPINS13. Slide the powe
2–9 SA600 and SA800 Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2–102–10 SA600 and SA800 Physical Specifications . . . . . .
15. Disconnect all power cords from the power controller and pull them throughthe opening in the power controller.16. Remove the kepnut that secures t
Figure 4–8 H9A00 Power ControllerCOM-0120POWERCONTROLLER10-32 × 1/2-INCHSCREWSPOWERCONTROLLERL-SHAPEDBRACKETRemoving and Replacing Cabinet Compone
5Storage Array Add-Ons and UpgradesThis chapter explains how to install add-on storage devices1and upgrade storagearrays."Add-ons" are stora
5.1 Required ToolsInstallation and upgrade procedures require the following tools:• #1 Phillips screwdriver• #2 Phillips screwdriver• 1/8-inch hex wre
CAUTIONDo not attempt to install a storage device or storage array unless youhave received training in electrostatic discharge (ESD) procedures andhav
Figure 5–1 Extending the Cabinet Stabilizer FootSTABILIZER FOOTCXO-2448A4. Lift the unit from the shipping container.5. Locate the installation hardwa
Figure 5–2 RA9x Disk Drive PackagingCONTAINERDESICCANTSHIPPINGSTRAPSCXO-2067D_SRA90/RA92DISKDRIVEMANUALSOCPBARRIERBAGPLASTIC BAGCONTAININGHARDWAREStor
5.3.2 Packing Storage DevicesUse the original shipping containers to pack storage devices for shipment orstorage. Each piece of equipment must be seal
9. Secure the safety strap around the storage device.10. Lower the lift platform to no more than 12 inches off the floor.11. Transport the storage devi
PrefaceThis manual contains an overview of the SA™xxx storage array family anddescribes installation procedures for various configurations. Specifically
3. Carefully remove the first weight.4. Remove the three Phillips pan-head screws from the rear weight bracket.5. Remove the three Phillips pan-head sc
Figure 5–3 SA600 Stabilizer PlatesHEX-HEADBOLTSEMSNUTSEMSNUTHELICALSPLITLOCKWASHERFLATWASHERREARWEIGHTBRACKETWEIGHTWEIGHTFRONTWEIGHTBRACKETPAN-HEADSCR
5.5.2 Preparing for InstallationThe following procedure for installing RA9x disk drives is applicable to SA600,SA650, SA800, and SA850 storage arrays.
Figure 5–4 Removing the OCPDRIVE FRONTCOM-0105OPERATORCONTROLPANELBEZEL CONNECTOR CAPRA90Storage Array Add-Ons and Upgrades 5–11
Figure 5–5 RA9x Add-On Sequence—SA600/SA800 Storage Array (Front View)76103254CXO-2141B5–12 Storage Array Add-Ons and Upgrades
Figure 5–6 RA9x Add-on Sequence—SA650/SA850 (Front View)543210ENCLOSUREADD-ONPOSITIONCOM-0102Storage Array Add-Ons and Upgrades 5–13
Figure 5–7 SA6xx and SA8xx Chassis Retaining and Stabilizer BracketsWASHERSSHORTPAN-HEADSCREWSCHASSISRETAININGBRACKETSCHASSISSTABILIZERBRACKETCXO-2720
Figure 5–8 SA600/SA800 Chassis Stabilizer Brackets76103 25 4CXO-2908ACHASSIS STABILIZERBRACKET FOR DRIVEPOSITION 6CHASSIS STABILIZERBRACKET FOR DRIVEP
Figure 5–9 SA650/SA850 Chassis Stabilizer Brackets103 25 4DRIVE 2DRIVE 4CHASSISSTABILIZERBRACKETCHASSISSTABILIZERBRACKETSIDE VIEWCXO-2929AENCLOSUREADD
Figure 5–10 SA600/SA800 Chassis Stabilizer Brackets—Mounting76103 25 4DRIVE 2DRIVE 0CHASSISSTABILIZERBRACKETCHASSISSTABILIZERBRACKETSIDE VIEWCXO-2721A